Pc360 excavator 100 hours maintenance
1 Remove the water from the water cooler and the surface of the hydraulic excavator spare parts, and then remove it every 100 hours.
2 Remove water and sediment from the bottom of the fuel tank.
3 Diesel engine maintenance: change the oil, replace the oil filter, replace the oil water separator and the cooling water filter, and replace it every 250 hours after the operation. Check the ventilation and heat dissipation of the diesel engine, whether the heat insulation part is intact, whether the air intake pipe is closed, check the air filter. Whether the air intake system is clean, if it is found that deformation distortion must be replaced, check the antifreeze, check the belt tightness, antifreeze with ethylene glycol 50%, soft water 50%, DCA4 1 / 2 units per gallon.
4 After using for 200 hours, the left and right arm kingpins of the wheeled machine must be filled with butter.
Pc360 excavator maintenance
Pc360 excavator 250 hours maintenance
1 Hydraulic tank maintenance: Replace the oil return filter for the first time (it must be replaced every 500 hours later).
2 Servo oil filter excavator spare parts maintenance: Replace the filter element (it must be replaced every 500 hours later).
3 Remove the water cooler, the ash accumulated on the surface of the hydraulic oil cooler, and then clear it every 100 hours.
4 +Al removes water and sediment from the bottom of the fuel tank.
5 Diesel engine maintenance: change the oil, replace the oil filter, replace the oil water separator and the cooling water filter, and replace it every 250 hours after the operation. Check the ventilation and heat dissipation of the diesel engine, whether the heat insulation part is intact, whether the air intake pipe is closed, check the air filter. Whether the air intake system is clean, if it is found that deformation distortion must be replaced, check the antifreeze, check the belt tightness, antifreeze with ethylene glycol 50%, soft water 50%, DCA4 1 / 2 units per gallon.
6 After using for 200 hours, the left and right arm kingpins of the wheeled machine must be filled with butter.
7 Clean the hydraulic oil and diesel engine oil cooler, the dust outside the tank.
Pc360 excavator 500 hours maintenance
1 Rotary reducer maintenance: the first oil change, grade CLF90 GB13895-92, fill the inner ring of the slewing ring with lubricating oil. Replace it every 500 hours after work.
2 Hydraulic tank maintenance: clean the magnetic rod, replace the oil return filter, and replace it every 500 hours after the work. If you need to add hydraulic oil, please add the same grade hydraulic pressure.
3 Servo oil filter maintenance: clean the magnetic cup. Replace the servo filter.
4 Travel gearbox, gearbox maintenance: the first oil change, grade CLF90, GB13895-92. After every 500 hours of work replacement.
5 Check and adjust each operating mechanism, tire machine check to adjust the toe, brake system.
6 Diesel engine original spare parts maintenance: change the oil, replace the oil filter, replace the diesel filter, replace the coolant water filter, replace it every 250 hours, check the air filter intake system, seal the condition. Check the antifreeze, Check the belt tightness, antifreeze with ethylene glycol 50%, soft water 50%, DCA4 1 / 2 units per gallon.
7 Check the tightness of the walking track and adjust the running brake (the bottom of the track is 80-100 mm).
8 Check the hydraulic system pressure parameters, the wear of the bushing of the working device (if the wear is large, it must be replaced), etc., if necessary, extract the hydraulic oil sample (checked by professional service personnel).
9 Guide wheel: Fill the lubricant, please fill with a syringe syringe.
10 Clean the fuel tank.
11 Check the fastening and effectiveness of the driver's cab and the cooler cushion.
12 Check the wear of the bushing. If the bushing is worn out, it must be replaced. https://jnjmzm.wixsite.com/sdjygcjx